Is Wauchope #2 working right now?
Wauchope #2 is currently listed as "Operational" on Plugroo. The live status card on this page shows the confidence score and the last verified check-in, so check it before you drive.
42 Hastings Street, Wauchope NSW 2446
Usually works, but no recent check-ins to confirm
0 successful and 1 failed check-ins in the last 14 days.

CCS 2
60 kW
$0.79
1 plug

CHAdeMO
60 kW
$0.79
1 plug
Hard to find? Help others by editing.
1 check-ins and reviews
Share what's good to know.
The NRMA has built one of Australia’s well-known public fast-charging networks, with a focus on regional towns and key travel routes. Backed by the motoring club, the network aims to make electric road trips practical by filling gaps between major cities.
Notice a problem?
Tell us what needs attention at this charging station.
Own this charging station?
Claim it to keep the details accurate and manage this listing.
Contact PlugrooWauchope #2 is currently listed as "Operational" on Plugroo. The live status card on this page shows the confidence score and the last verified check-in, so check it before you drive.
Wauchope #2 has 1× CCS 2 · 1× CHAdeMO, with up to 60 kW of charging power.
Charging at Wauchope #2 costs $0.79. Rates can change by time of day, so check the plug and cost breakdown on this page.
Wauchope #2 is open: Open 24 hours.
Wauchope #2 is at 42 Hastings Street, Wauchope NSW 2446. Use the "Get directions" button on this page for turn-by-turn navigation.
Wauchope #2 is operated by NRMA.
Last updated on August 16, 2026