EV Charging Stations Cherry Gardens – Find Chargers Near You | Plugroo

Stations

EV Charging Stations inCherry Gardens, SA

Cherry Gardens is an ABS Suburb and Locality covering approximately 15.9 km² with a 2021 Census population of 633. Plugroo maps the public electric vehicle charging stations available in this area with live status, pricing and verified plug types.

9
Public chargers in Cherry Gardens
4
DC fast charging stations
0
Free EV charging sites
4
Charging networks covered

How to find EV charging stations in Cherry Gardens with Plugroo

Cherry Gardens is an ABS Suburb and Locality covering approximately 15.9 km² with a 2021 Census population of 633.

Open the map above to see every EV charging station in Cherry Gardens in real time. Filter by charger speed, plug type, network, price, free charging and 24/7 access.

The 2021 Census profile for Cherry Gardens reports a median age of 48, an average household size of 2.9 people and a median weekly household income of $2,016. These figures describe this SAL rather than a wider metropolitan area.

Plugroo helps Cherry Gardens EV drivers avoid stale charger directories by combining operator data with verified community reports, so station status, access rules and pricing are easier to check before you arrive.

Cherry Gardens at a glance

The ABS identifies Cherry Gardens as SAL 40249. Its 2021 Census profile records 633 residents across approximately 15.9 km².

633
Population
15.9 km²
Area
48
Median age

Types of EV chargers in Cherry Gardens

Cherry Gardens EV charging stations usually fall into four speed tiers. Choosing the right tier matters more than choosing the closest pin.

Level 1 - 1.4 kW

Trickle charging

Standard 10A AC power point. Adds 8-15 km of range per hour and is mostly used at home.

Level 2 - 7-22 kW

AC destination

The most common public charger type in Australian cities, found at shopping centres, hotels and council car parks.

Level 3 - 50-150 kW

DC fast charging

Workhorse fast chargers from Evie, Chargefox, NRMA, Ampol and other national networks. Usually 10-80% in 30-45 minutes.

Level 3+ - 250-350 kW

Ultra-rapid DC

The fastest public EV charging tier, including Tesla V3/V4, Evie and Chargefox ultra-rapid highway and metro sites.